As a user, it should be noted that both before and after installation, the corresponding job requirements need to be completed during and after use. First of all, before using the vertical plate lifting clamp, be sure to check the checked items, confirm the weight and correctly find the center position. If there is oil or water on the object being lifted, be sure to wipe it clean before using the vertical plate lifting clamp.

 

At the same time, attention must be paid to ensuring the safety of the on-site operation environment. During the use of the vertical steel plate lifting clamps, no personnel shall enter the range where the hanging objects may fall or turn over. Workers should be careful not to carry out work that is clamped in the transverse direction to prevent longitudinal lifting of the steel plate, otherwise it may lead to dangerous accidents. When you need to use multiple steel cables for lifting work, you should pay attention to the offset load.

 

It is important to remember that the appropriate hoisting ropes and chains that meet the specifications are to be selected, and the presence or absence of bending and twisting on the cables and chains must be confirmed before the vertical steel crane clamps start lifting work. Note that it is not allowed to use a hook and use several clamps to hold several hanging objects to lift the work. Otherwise, dangerous accidents may occur. Then, when installing, what issues need attention?

 

Normally, when installing the vertical plate lifting clamp, the clamped position of the suspended object should be determined first. Care must be taken to avoid the locking bar or snap hooks coming into contact with the ropes, chains, rings, and items that are hung during or on the roll. At the same time, it is also necessary to confirm whether the installation position of the clamp is higher than the center of gravity of the hanging object, and confirm whether the locked position is in a good locking state.

 

In addition, after the lifting work of the vertical plate lifting clamp is completed, it is necessary to do a good job. Note that when performing the flipping work, pay attention to the heavy load. At the same time, the vertical plate lifting pliers and cranes should be operated slowly and carefully to avoid imposing impact loads on the objects or clamps. When placing shaped material on the floor, be sure to use the stand.

 