Contact Us

Wuxi Yongchang Lifting Equipment Co.,Ltd

Add: No.1 Gangwang Road, Donggang Town, Xishan District, Wuxi, Jiangsu, China

Contact: Kira

Mob: +86-18306184512

Tel: +86-510-82302707

E-mail: kira@yc-lift.com

Skype: Kira Lee YC

Home > Knowledge > Content
Mini electric hoist after installation inspection
Feb 07, 2018

1, all the lubrication part is enough to add grease.

2, the location of single-track installation is reasonable.

3, the voltage at the installation site is consistent with the standard voltage.

4, check the rope part of the loose, tie the phenomenon, while others are to be adjusted.

5, with the rated load to start the lifting and running agencies to see if the operation is normal, check the sliding distance is in line with the provisions and whether there is oil leakage gear.


Previous: Hand chain block components and advantages of use

Next: Frequency electric hoist what are the tonnage and features?